Download Free VCE Files: CCNA, A+ Certification, MCSE – Cert4sure CCDP,Cisco [Free New Dumps Version] Latest Release Cisco SWITCH 300-115 Dump Exam Question Youtube Study Guide Free Shared

[Free New Dumps Version] Latest Release Cisco SWITCH 300-115 Dump Exam Question Youtube Study Guide Free Shared

Where do I get trusted Cisco dumps for 300-115? The Implementing Cisco IP Switched Networks (300-115 SWITCH) exam is a 120 minutes (30-40 questions) assessment in pass4itsure that is associated with the CCNP Routing and Switching, CCDP certification. Latest release Cisco SWITCH 300-115 dump exam question Youtube study guide free shared. “Implementing Cisco IP Switched Networks” is the exam name of Pass4itsure Cisco 300-115 dump test which designed to help candidates prepare for and pass the Cisco 300-115 exam. CCNP Routing and Switching SWITCH https://www.pass4itsure.com/300-115.html dump guide from Pass4itsure enables you to succeed on the exam the first time and is the only self-study resource approved by Cisco.

[Free New Pass4itsure 300-115 Dumps Version From Google Drive]: https://drive.google.com/open?id=0BwxjZr-ZDwwWbVlmaEVvUmZqT2c

[Free New Pass4itsure 210-260 Dumps Version From Google Drive]: https://drive.google.com/open?id=0BwxjZr-ZDwwWU0xad3NvRWR4Qzg

300-115 dumps

Free Pass4itsure 300-115 Dumps Exam Questions and Answers:

QUESTION 33 A switch is added into the production network to increase port capacity. A network engineer is configuring the switch for DHCP snooping and IP Source Guard, but is unable to configure ip verify source under several of the interfaces. Which option is the cause of the problem?
A. The local DHCP server is disabled prior to enabling IP Source Guard.
B. The interfaces are configured as Layer 3 using the no switchport command.
C. No VLANs exist on the switch and/or the switch is configured in VTP transparent mode.
D. The switch is configured for sdm prefer routing as the switched database management template.
E. The configured SVIs on the switch have been removed for the associated interfaces.
300-115 exam Correct Answer: B
QUESTION 34 Which command correctly configures standby tracking for group 1 using the default decrement priority value?
A. standby 1 track 100
B. standby 1 track 100 decrement 1
C. standby 1 track 100 decrement 5
D. standby 1 track 100 decrement 20
Correct Answer: A
QUESTION 35 Which database is used to determine the validity of an ARP packet based on a valid IP-to- MAC address binding?
A. DHCP snooping database
B. dynamic ARP database
C. dynamic routing database
D. static ARP database
300-115 dumps Correct Answer: A
QUESTION 36 RSPAN has been configured on a Cisco Catalyst switch; however, traffic is not being replicated to the remote switch. Which type of misconfiguration is a cause?
A. The RSPAN designated VLAN is missing the remote span command.

B. The local and remote RSPAN switches are configured using different session IDs.
C. The local RSPAN switch is replicating only Rx traffic to the remote switch.
D. The local switch isoverloaded with the amount of sourced traffic that must be replicated to the remote switch.
Correct Answer: A
QUESTION 37 Refer to the exhibit.
300-115 dumps

When a network administrator is attempting an SSH connection to the device, in which order does the device check the login credentials?
A. RADIUS server, localusername, line password
B. RADIUS server, line password, local username
C. Line password, local username, RADIUS server
D. Line password, RADIUS server, local username
300-115 pdf Correct Answer: A

QUESTION 38 You are giving the debug RHCT exam. The examiner told you that the password of root is redhat. When you tried to login displays the error message and redisplayed the login screen. You changed the root password, again unable to login as a root. How will you make Successfully Login as a root.
Answer and Explanation:
When root unable to login into the system think:
1. Is password correct?
2. Is account expired?
3. Is terminal Blocked?
Do these Steps:
. Boot the System on Single user mode.
. Change the password
. Check the account expire date by using chage -l root command.
If account is expired, set net expire date: chage -E “NEVER” root
1. Check the file /etc/securetty Which file blocked to root login from certain terminal.
2. If terminal is deleted or commented write new or uncomment.
3. Reboot the system and login as a root.
QUESTION 39 You are giving RHCT Exam and in your Exam paper there is a written, make successfully ping to 192.168.0.254.
300-115 vce Answer and Explanation:
In Network problem thinks to check:
1. IP Configuration: use ifconfig command either IP is assigned to interface or not?

2. Default Gateway is set or not?
3. Hostname is set or not?
4. Routing problem is there?
5. Device Driver Module is loaded or not?
6. Device is activated or not?
Check In this way:
1. use ifconfig command and identify which IP is assigned or not.
2. cat /etc/sysconfig/network What, What is written here. Actually here are these parameters.
NETWORKING=yes or no
GATEWAY=x.x.x.x
HOSTNAME=?
NISDOMAIN=?
– Correct the file
QUESTION 40 Use vi /etc/sysconfig/network-scirpts/ifcfg-eth0 and check the proper options
DEVICE=eth0
ONBOOT=yes
BOOTPROTO=static
IPADDR=x.x.x.x
NETMAKS=x.x.x.x
GATEWAY=x.x.x.x
QUESTION 41  Set the Hostname station?.example.com where ? is your Host IP Address.
300-115 exam Answer and Explanation:
1. hostname station?.example.com This will set the host name only for current session. To set hostname permanently.
2. vi /etc/sysconfig/network HOSTNAME=station?.example.com
3. service network restart

QUESTION 42 The System you are using is for NFS (Network File Services). Some important data are shared from your system. Make automatically start the nfs and portmap services at boot time.
Answer and Explanation:
We can control the services for current session and for next boot time also. For current Session, we use service servicename start or restart or stop or status. For automatically on next reboot time:
1. chkconfig servicename on or off
eg: chkconfig nfs on chkconfig portmap on or ntsysv Select the nfs and portmap services.
2. Reboot the system and identify whether services are running or not.

QUESTION 43
Change requests are processed for review and disposition according to which process?
A. Control Quality
B. Control Scope
C. Monitor and Control Project Work
D. Perform Integrated Change Control
300-115 dumps Correct Answer: D
QUESTION 44
The review of a sellers progress toward achieving the goals of scope and quality within cost and schedule
compared to the contract is known as:
A. Work performance information.
B. Inspections and audits.
C. Payment systems.
D. Procurement performance reviews.

Correct Answer: D
QUESTION 45
The iterative and interactive nature of the Process Groups creates the need for the processes in which Knowledge Area?
A. Project Communications Management
B. Project Integration Management
C. Project Risk Management
D. Project Scope Management
300-115 pdf Correct Answer: B
QUESTION 46
Market conditions and published commercial information are examples of which input to the Estimate
Costs process?
A. Scope baseline
B. Organizational process assets
C. Enterprise environmental factors
D. Risk register
Correct Answer: C
QUESTION 47
An output of the Develop Project Team process is:
A. Organizational process assets.
B. Enterprise environmental factors updates.
C. Project staff assignments.
D. Organizational charts and position descriptions.
300-115 vce Correct Answer: B
QUESTION 48
The process of confirming human resource availability and obtaining the team necessary to complete
project activities is known as:
A. Plan Human Resource Management.
B. Acquire Project Team.
C. Manage Project Team.
D. Develop Project Team.
Correct Answer: B
QUESTION 49
Which item is an example of personnel assessment?
A. Resource calendar
B. Tight matrix
C. Team-building activity
D. Focus group
300-115 exam Correct Answer: D
QUESTION 50
The Plan Stakeholder Management process belongs to which Process Group?
A. Executing
B. Initiating
C. Planning
D. Monitoring and Controlling
Correct Answer: C
QUESTION 51
Which input to the Manage Stakeholder Engagement process provides guidance on how stakeholders can
best be involved in a project?
A. Feedback analysis
B. Stakeholder analysis
C. Communication management plan
D. Stakeholder management plan
300-115 dumps Correct Answer: D
QUESTION 52
A method of obtaining early feedback on requirements by providing a working model of the expected
product before actually building is known as:
A. Benchmarking.
B. Context diagrams.
C. Brainstorming.
D. Prototyping.
Correct Answer: D
QUESTION 53
Which stakeholder classification model groups stakeholders based on their level of authority and their active involvement in the project?
A. Power/influence grid
B. Power/interest grid
C. Influence/impact grid
D. Salience model
300-115 pdf Correct Answer: A
QUESTION 54
Which Plan Schedule Management tool or technique may involve choosing strategic options to estimate and schedule the project?
A. Facilitation techniques
B. Expert judgment
C. Analytical techniques
D. Variance analysis
Correct Answer: C
QUESTION 55
Which basic quality tool is most useful when gathering attributes data in an inspection to identify defects?
A. Control charts
B. Pareto diagrams
C. Ishikavva diagrams

D. Checksheets
300-115 vce Correct Answer: D
QUESTION 56
The process of estimating the type and quantity of material, human resources, equipment, or supplies required to perform each activity is known as:
A. Collect Requirements.
B. Conduct Procurements.
C. Estimate Activity Durations.
D. Estimate Activity Resources.
Correct Answer: D
QUESTION 57
Which input to the Identify Stakeholders process provides information about internal or external parties related to the project?
A. Procurement documents
B. Communications plan
C. Project charter
D. Stakeholder register
300-115 exam Correct Answer: C
QUESTION 58
The Identify Stakeholders process is found in which Process Group?
A. Initiating
B. Monitoring and Controlling
C. Planning
D. Executing
Correct Answer: A
QUESTION 59
An input to Develop Project Charter is a/an:
A. Business case.
B. Activity list.
C. Project management plan.
D. Cost forecast.
300-115 dumps Correct Answer: A
QUESTION 60
Which item is a formal proposal to modify any document, deliverable, or baseline?
A. Change request
B. Requirements documentation
C. Scope baseline
D. Risk urgency assessment
Correct Answer: A
QUESTION 61
Which process determines the risks that may affect the project and documents their characteristics?
A. Control Risks
B. Plan Risk Management
C. Plan Risk Responses
D. Identify Risks
300-115 pdf Correct Answer: D
QUESTION 62
An example of a group decision-ma king technique is:
A. Nominal group technique.
B. Majority.
C. Affinity diagram.
D. Multi-criteria decision analysis.
Correct Answer: B
QUESTION 63
A risk response strategy in which the project team shifts the impact of a threat, together with ownership of the response, to a third party is called:
A. mitigate
B. accept
C. transfer
D. avoid
300-115 vce Correct Answer: C
QUESTION 64
An output of the Plan Quality Management process is:
A. A process improvement plan,
B. Quality control measurements.
C. Work performance information,
D. The project management plan.
Correct Answer: A
QUESTION 65
A project manager should document the escalation path for unresolved project risks in the:
A. Change control plan
B. Stakeholder register
C. Risk log
D. Communications management plan
300-115 exam Correct Answer: D
QUESTION 66
Which process in Project Time Management includes reserve analysis as a tool or technique?
A. Estimate Activity Resources
B. Sequence Activities
C. Estimate Activity Durations
D. Develop Schedule

Correct Answer: C
QUESTION 67
Which risk management strategy seeks to eliminate the uncertainty associated with a particular upside risk by ensuring that the opportunity is realized?
A. Enhance
B. Share
C. Exploit
D. Accept
300-115 dumps Correct Answer: C
QUESTION 68
Payback period, return on investment, internal rate of return, discounted cash flow, and net present value are all examples of:
A. Expert judgment.
B. Analytical techniques.
C. Earned value management.
D. Group decision-making techniques.
Correct Answer: B
QUESTION 69
The definition of when and how often the risk management processes will be performed throughout the project life cycle is included in which risk management plan component?
A. Timing
B. Methodology
C. Risk categories
D. Budgeting
300-115 pdf Correct Answer: A
QUESTION 70
When a backward pass is calculated from a schedule constraint that is later than the early finish date that has been calculated during a forward pass calculation, this causes which type of total float?
A. Negative
B. Zero
C. Positive
D. Free
Correct Answer: C
QUESTION 71
A reward can only be effective if it is:
A. Given immediately after the project is completed.
B. Something that is tangible.
C. Formally given during project performance appraisals.
D. Satisfying a need valued by the individual.
300-115 vce Correct Answer: D
QUESTION 72
Which tool or technique allows a large number of ideas to be classified into groups for review and
analysis?
A. Nominal group technique
B. Idea/mind mapping
C. Affinity diagram
D. Brainstorming
Correct Answer: C
QUESTION 73
Using values such as scope, cost, budget, and duration or measures of scale such as size, weight, and
complexity from a previous similar project as the basis for estimating the same parameter or measurement
for a current project describes which type of estimating?
A. Bottom-up
B. Parametric
C. Analogous
D. Three-point
300-115 exam Correct Answer: C
300-115 dumps

“Implementing Cisco IP Switched Networks”, also known as 300-115 exam, is a Cisco certification which covers all the knowledge points of the real Cisco exam. Pass4itsure Cisco 300-115 dump exam questions answers are updated (456 Q&As) are verified by experts. The associated certifications of 300-115 dump is CCNP Routing and Switching, CCDP. Expert engineer shares preparation hints and test-taking tips, helping you identify areas of weakness and improve https://www.pass4itsure.com/300-115.html dumps both your conceptual knowledge and hands-on skills.